Intro
Welcome! Since we purchased our house at 19 University Drive, we have undertaken many projects. These include numerous landscaping projects, building a new shed, replacing a number of windows and the front door, painting every room in the house, replacing trim, upgrading electrical wiring and lighting, installing a propane tank and a gas stove, plumbing updates, adding window treatments and shelving, etc. But we are now undertaking our biggest construction project yet!!The plan:
- Tear off the roof and add a dormer along the back of the house (spanning 2/3 of the house)
- Demolish the existing space, including existing tiny bathroom, wood-paneled walls, flooring ... everything must go
- Create a new master bedroom suite with wooded views, a luxurious bathroom, and closets for two
- Insulate and Re-Roof while we're at it
For this project, we have enlisted the help of some local
contractors. The project has been in the
planning stages since November 2005. We
settled on a plan and price with the contractors in late spring (2006), and
construction is slated to begin September 18th, 2006. We'll be posting
periodic updates here on our website. Stay tuned!
Before
- Existing Flooplan (PDF)
- Proposed Flooplan (PDF)
- Photos of the old space (inside)
- Photos of the front and back of the house, before...
Updates Week 1 (9/26 and 9/30) - Deconstruction
Updates Week 2 (10/2 through 10/7) - Framing
Updates Week 3 (10/9 through 10/13) - Framing
Updates Week 4 & 5 (10/14 through 10/26) - Roofing, plumbing, etc.
Updates Week 6 & 7 (10/30 through 11/10) - Windows, tub, electric, siding, insulation
Updates Week 8 & 9 (11/13 through 11/24) - Insulation, Plaster
Updates Week 10-14 (11/26 through 12/31) - Lighting, floor tile, paint
Updates Week 15-20 (1/1 through 2/12) - Flooring, trim, tile